This was a new construction of an engineering hall with the floor area of 16,500 m2 with variable height – one half was 17 m and the other half was 11 m high (there are two cranes in the higher part, each of which has a 160 m track and a span of 24,5 m). The project also included the construction of an electric transformer station and the main switchboard. The floor is a steel fibre concrete one, ventilation is only passive (via shutters). The contract also included installation of distribution pipes for gas, HPA, industrial and cooling water, a compressor room and an air-conditioning machine shop with a cooling tower.