It was a storage hall with the floor area of 5,000 m2 and transfer hall with the floor area of 1,000 m2. The premises construction included the building of a so-called connecting link, which is a four-storey administrative building, as well as construction of roads and utility line network. The work was implemented using prefabricated constructions.