SCHENKER logistics terminal

2005  ·  Manufacturing halls and warehousing

Price (excl. VAT) CZK 130,000,000

It was a storage hall with the floor area of 5,000 m2 and transfer hall with the floor area of 1,000 m2. The premises construction included the building of a so-called connecting link, which is a four-storey administrative building, as well as construction of roads and utility line network. The work was implemented using prefabricated constructions.

  • client
    LogCap CR, s.r.o.
  • PERIOD OF PERFORMANCE
    07/2004 - 02/2005
  • LOCATION
    Liberec