GESTAMP CZECH, PZ Triangle Zatec

2012  ·  Manufacturing halls and warehousing

Price (excl. VAT) CZK 317,000,000

The construction of a new pressing plant manufacturing steel parts for the automotive industry in the current Triangle Zatec industrial zone, including a line for hot and cold moulding, automatic welding and laser cutting and a warehouse for storing input materials and finished moulded pieces. The supply included bearing piles, prefabricated reinforced concrete structures, buildings, small structures and outdoor infrastructure.

  • client
    GESTAMP LOUNY s. r. o.
  • PERIOD OF PERFORMANCE
    06/2011 - 01/2012
  • LOCATION
    Zatec