R3 flat glass production plant

2007  ·  Manufacturing halls and warehousing

Price (excl. VAT) CZK 141,000,000

The extension of Glaverbel Teplice flat glass manufacturing plant. The building works included shell construction of SO-1510, SO-1610 and SO-1241 structures, including a concrete skeleton, concrete floors, steel constructions and cladding of the structures.

  • client
    Glaverbel Czech a.s., member of the Glaverbel group
  • PERIOD OF PERFORMANCE
    11/2006 - 09/2007
  • LOCATION
    Teplice