This project included construction work in the course of building a manufacturing hall with the exception of foundations and the load-bearing structure – skeleton. The construction work included the following facilities: SO 03 Manufacturing hall, SO 04 training centre and SO 10 WWTP. The whole construction was interesting due to its scope of about 45.000 m2.