LAIRD TECHNOLOGIES manufacturing plant

2003  ·  Manufacturing halls and warehousing

Price (excl. VAT) CZK 165,000,000

This was a construction of a manufacturing hall for electrotechnical production including a plating shop, offices and roads. The hall covers an area of about 11,000 m2, and the administrative building an area of 1,500 m2.

  • client
    Laird Technologies s.r.o.
  • PERIOD OF PERFORMANCE
    07/2003 - 12/2003
  • LOCATION
    Liberec