The partial revitalization of high school premises built in 1967 and construction of a new 7-storey concrete monolith building.
The total built-up area equals 4,357 m2. The new building and partially revitalized current buildings are used for the education of students in fields such as machinery, building construction, electrical engineering, management and public administration, namely within the framework of standard education, training in requalification courses, ICT courses, pedagogical staff training and adult education. The total capacity of the school (new buildings, buildings 1, 2 and 4) is 1,200 students and 130 employees.