Indoor swimming pool reconstruction

2001  ·  Sports facilities

Price (excl. VAT) CZK 94,000,000

The project included the reconstruction of an indoor swimming pool – the current 25 m long pool including a children’s pool – and of the current support facilities (dressing rooms, entrance, offices), including panelling, new lockers, plasters and painting. A structure housing an attraction pool was added to the current swimming pool – it is a reinforced concrete structure insulated by thermal insulation screed and the pool is lined with mosaic tiles. The pool perimeter is lined with insulating glass in aluminium frames. The bearing structure of the attraction pool is a steel structure with protective coating. The attraction pool itself comprises of an artificial river, two toboggan slides, a pool with artificial waves, two whirlpool baths, water spouts and massage benches.

  • client
    The town of Jablonec nad Nisou
  • PERIOD OF PERFORMANCE
    10/2000 - 11/2001
  • LOCATION
    Jablonec nad Nisou