C. S. CARGO logistic centre – Stage II

2005  ·  Manufacturing halls and warehousing

Price (excl. VAT) CZK 50,000,000

This was an addition to the current logistic centre in Liberec Industrial Zone – South during its full operation, namely construction of an industrial hall and an administration building. The construction system consists of a reinforced concrete skeleton clad with Kingspan panels with foil roof cladding, steel fibre concrete floor with a screed (incl. an antistatic one). The project also comprised extension of hard concrete or asphalt surfaces and landscaping. All the work was carried out under full operation of the logistic centre.

  • client
    C. S. CARGO s.r.o.
  • PERIOD OF PERFORMANCE
    01/2005 - 06/2005
  • LOCATION
    Liberec