This was the initial stage of industrial zone construction in Krupka u Teplic. Electricity, gas and water mains and sewer system connections were brought to all the plots in the planned industrial zone. The building site preparation also included the construction of a new transformer station, a brook culvert under road no. I/13, partial relocation of a third-class road to Krupka and relocation of a high pressure gas pipeline.