The aim of the construction was to complete the area related to the addition of the log sorting line No. 2. The construction consists mainly of rough landscaping, traffic roads and paved areas including drainage, area water supply and sewage, area high and low voltage distribution, low-voltage distribution, outdoor area lighting, reinforced concrete foundations and technology buildings, a steel sorting line hall and a control room building. The work was carried out in full operation without interruption of production and distribution of products.